Get Adobe Flash player

Floor Install – VIII

 

Wrap of of the base floor installation

Pictures Taken: 7/21/2015 (First 5), 7/22/2015 (6-10), & 7/31/2015 (Last)

Leave a Reply

You must be logged in to post a comment.